
On Friday, we worked as long as we could with the sheet rock that we had and made great progress. Almost the entire inside sheet rock was complete. There are a couple of walls left to do. A group of the team from Shelburne was going to work on Saturday and do what they could to complete that work. There was also about two pieces of siding to be put up on the back and that would be done. Many people worked to caulk seams and around the windows. Some followed along and touched up the prepainted siding.
As we left it looked great.
No comments:
Post a Comment